Probable maximum precipitation for the catchment of Koyna dam
DOI:
https://doi.org/10.54302/mausam.v49i2.3620Keywords:
Probable maximum precipitation (PMP), Spillway design floodAbstract
Estimates of Probable Maximum Precipitation (PMP) for different durations were made for the catchment above Koyna dam on the Koyna river. The catchment spans an area of 892 km2 and the PMP estimates were made for a range of durations of 1 to 3 days. The PMP estimates for Koyna dam were found to be 48, 87 and 117 cm by the physical method and 54, 89 and 124 cm by statistical method for 1, 2 and 3 day respectively. These estimates can be used to check the existing spillway design flood of Koyna dam.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 MAUSAM
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
All articles published by MAUSAM are licensed under the Creative Commons Attribution 4.0 International License. This permits anyone.
Anyone is free:
- To Share - to copy, distribute and transmit the work
- To Remix - to adapt the work.
Under the following conditions:
- Share - copy and redistribute the material in any medium or format
- Adapt - remix, transform, and build upon the material for any purpose, even
commercially.